AfDB-FINANCED | ABV-COMMISSIONED | GRANT FAT N° 5900155017857 | PROJECT ID P-Z1-EAO-012
Client: Autorité du Bassin de la Volta (ABV) / Volta Basin Authority — the transboundary river basin organization of Benin, Burkina Faso, Côte d’Ivoire, Ghana, Mali, and Togo, established by the 2007 Convention on the Status of the Volta River
Financing Partner: African Development Bank Group (AfDB), under the Project for Improving the Enabling Environment for Sustainable and Equitable Water Resources Management in the Volta Basin
Delivery Model: Jointly implemented by a consortium of firms, with mobilization beginning December 2025
RCG’s Role: RCG holds oversight responsibility for Volet 1 — the political-economy analysis of water resources and energy development in the Volta Basin, including mapping of political, economic, and social actors; analysis of governance instruments; and identification of factors that could advance or hinder the Noumbiel Dam’s development
Duration: 6-month study, structured across three components with staged deliverables and a regional validation workshop
Assignment Scope
The study evaluates the feasibility of the proposed Noumbiel Dam across three dimensions: a political-economy analysis of water and energy governance among the basin’s six riparian states (RCG’s oversight component); an analysis of current and potential beneficial water uses and the dam’s regional socioeconomic benefits; and an institutional options analysis for the dam’s future governance and financing, benchmarked against international practice for shared transboundary infrastructure.
Why It Matters
The Volta Basin spans nearly 400,000 km² and is home to roughly 29.6 million people as of 2016 — a population projected to more than double to 68 million by 2046. The basin has experienced a measurable decline in rainfall since the 1970s, and several member states rank among the lowest globally on the Human Development Index. Coordinated, evidence-based decision-making on shared infrastructure like Noumbiel is central to the basin’s climate resilience and economic future — and RCG’s Volet 1 analysis is what equips ABV’s six member states with a clear picture of the political and economic terrain before that decision is made.
Anticipated Impact
Informed transboundary decision-making for six governments and AfDB on a dam investment with direct implications for regional energy security, irrigated agriculture, and food security.
De-risked implementation, through RCG’s mapping of political actors, interests, and potential obstacles — surfacing risks before they become costly delays.
Strengthened institutional consensus, advancing ABV’s founding mandate of equitable benefit-sharing among riparian states.
A governance model for shared infrastructure that builds on the basin’s existing track record of coordinated dam management (Akosombo, Bui, Bagré, Kompienga) and can inform future transboundary projects.